N. Ellsworth Road/225th Street Water Main Extension 

Box Elder, SD

The N. Ellsworth Road/225th Street Water Main Extension project included the preparation of construction plans and specifications for 4,900 linear feet of 10-inch water main and 800 linear feet of 8-inch sanitary sewer. The east roadside ditch was reconstructed along with the replacement of numerous driveway entrances and culverts. Advanced Design provided bidding and construction administration services including daily inspections and project closeout reports. Advanced Design coordinated with the US Army Corps of Engineers for a 404 permit for a portion of the water main extension located in existing wetlands. 

CLIENT: City of Box Elder

PROJECT: Project No. PWW-01-2018

COMPLETION: 2021


Previous
Previous

Orchard Meadows Subdivision

Next
Next

Box Elder Northern Lights Well & Reservoir